The block plant at Anarpura, Gazaria runs a Besser V-3 Vibrapac machine to produce some of the strongest concrete blocks in the world. The capacity of the Besser Plant is 4,320,000 blocks per year. The blocks can easily achieve strengths of over 30 MPa and are used in high-rise load bearing construction, especially suited for earthquake prone zones.
The entire Lake City project is constructed with these products, thus making the buildings more earthquake resistant than conventionally built buildings. The Vibrapac is a very versatile machine and can also produce non loadbearing products and pavers